Construction of a traction substation with power supply upgrades and landscaping
Usable area | 240 m2 |
Hardened surfaces | 700 m2 |
Subcontracting in (03.2019 – present):
- ETICS facade with rustication (500 m2)
- roofing with guttering
- plastering of interior walls
- construction of tracks for transformers and support structures for switchgears, rectifiers and control cabinets
- execution of raised floor
- mechanical ventilation with air intakes
- external hardening of concrete cubes (600 m2)
- land development including demolition of the existing traction substation