Schenker Sp. z o.o. – Stawiguda k/Olsztyna

Construction of a warehouse building (transhipment terminal)

with social and office facilities together with accompanying infrastructure

Usable floor area: 3,600 m2
Paved surfaces: 20,000 m2

Subcontracting in scope of (02.2016-10.2016):
  • Earthworks ~ 26,000 m3
  • External water and sewage networks, gas
  • Reinforced concrete works – foundations for the hall, office building, sheds and concierge, retaining walls
  • Shell in an open office building
  • Installation of reinforced concrete precast elements (dock sockets)
  • Soil stabilization ~ 20,000 m2
  • Road works ~ 17,000 m2
  • Rainwater connection 640 mb

Galeria