MPK Łódź Sp. z o.o.

Construction of a traction substation together with modernization of power supply and land development

Usable floor area: 240 m2
Paved surfaces: 700 m2

Subcontracting in scope of (03.2019 – untill now):
  • facade in the ETICS system with rustication (500 m2)
  • roof covering with guttering
  • plastering interior walls
  • execution of tracks for transformers and support structures for switchgears, rectifiers and control cabinets
  • execution of raised floor
  • mechanical ventilation with air intakes
  • external hardening of concrete cubes (600 m2)
  • land development with the demolition of an existing traction substation