MPK Łódź Sp. z o.o.
Construction of a traction substation together with modernization of power supply and land development
Usable floor area: 240 m2
Paved surfaces: 700 m2
Subcontracting in scope of (03.2019 – untill now):
- facade in the ETICS system with rustication (500 m2)
- roof covering with guttering
- plastering interior walls
- execution of tracks for transformers and support structures for switchgears, rectifiers and control cabinets
- execution of raised floor
- mechanical ventilation with air intakes
- external hardening of concrete cubes (600 m2)
- land development with the demolition of an existing traction substation