PPHU CASMET-SYSTEM Łubna
Construction of a production and storage hall
together with an office and social building, as well as internal and external installations with land development
Usable floor area: 3,200 m2
Paved surfaces: 3000 m2
General Contractor (06.2018-04.2019):
- earth works reinforced concrete (foundations, feet, foundation walls, ceilings)
- shell of an open office building (600 m2)
- assembly of the hall casing
- roof covering with a system of continuous rooflights
- execution of an industrial floor
- external networks: drainage, dirty / clean storm water drainage, sanitary sewage system, prefabricated retention tank 200 m3, water supply and gas installation
- external hardening of concrete cubes (~ 3000 m2)
- turnkey interior design